JKZ Solids Control has successfully completed the installation of a comprehensive solids control system for a major oilfield operator in the Middle East. The project, which took six months from planning to commissioning, represents one of JKZ's largest international installations to date.
The integrated system includes state-of-the-art shale shakers, desanders, desilters, and high-speed centrifuges, all designed to maximize drilling efficiency and minimize environmental impact.
- Zhang Wei, Project Manager at JKZ Solids Control
The installation was part of a larger expansion project for the oilfield operator, who required a complete oilfield solids control solution capable of handling increased drilling activity. Key project details include:
2,000 GPM processing capacity with 99.5% solids removal efficiency
8 shale shakers, 4 desanders, 4 desilters, 6 centrifuges, and auxiliary equipment
6 months from initial planning to full commissioning and operation
25 JKZ engineers and technicians involved in the installation
The system was completed two weeks ahead of schedule and has already exceeded performance expectations, with a 15% improvement in drilling fluid recovery compared to the client's previous system.
The installed system features JKZ's latest technological innovations, including:
The project presented several significant challenges that the JKZ team successfully overcame:
Challenge | Solution | Result |
---|---|---|
Extreme desert temperatures | Special cooling systems and heat-resistant materials | Equipment operates efficiently in 50°C+ conditions |
Limited space availability | Custom compact design with vertical integration | 30% smaller footprint than standard systems |
Stringent environmental regulations | Closed-loop system with zero discharge capability | Full compliance with local environmental standards |
Complex logistics | Modular design for easier transportation and assembly | Reduced installation time by 40% |
The newly installed solids control system provides numerous benefits to the operator:
15% improvement in drilling fluid recovery and reduced waste generation
Estimated $2.5M annual savings in drilling fluid costs and disposal expenses
Reduced environmental footprint with closed-loop operation
Improved working conditions with automated controls and reduced manual handling
"JKZ's team demonstrated exceptional professionalism throughout the project. Their technical expertise and commitment to meeting our specific requirements resulted in a system that has already significantly improved our drilling operations. The ahead-of-schedule completion was particularly impressive given the challenging conditions." - Ahmed Al-Mansoori, Operations Director
Based on the success of this installation, the client has already engaged JKZ for two additional projects:
As part of the project, JKZ conducted comprehensive training for the client's operations and maintenance teams:
Contact our engineering team to discuss how JKZ can design and install a solids control system tailored to your specific operational requirements.
Contact Our Engineering TeamJKZ specializes in the design, manufacture, and installation of complete solids control systems for the oil and gas industry. Our systems integrate various solids control equipment to provide comprehensive solutions for drilling fluid management.
With projects completed in over 30 countries, JKZ has established itself as a global leader in solids control technology, consistently delivering systems that improve operational efficiency, reduce environmental impact, and lower overall drilling costs.